← All projects

3.75 kWp Hybrid Solar PV with Battery Backup – Residence, Welmilla

Hybrid solar system for a home in Welmilla, combining LG and JA Solar panels, Solis and Victron inverters and a 2.5 kWh battery for backup power.

Scope of work

Site survey and load assessment, design of a hybrid system combining an existing LG 310 Wp array with new JA Solar 550 Wp modules, supply and installation of a Solis 5 kW inverter and a Victron 3 kVA inverter/charger with a 2.5 kWh battery, DC/AC protection and earthing, testing and commissioning, and handover with user training.

About this project

This project expanded an existing rooftop solar system at a home in Welmilla into a hybrid installation with battery backup, lowering electricity bills and keeping essential loads running during power cuts.

System

  • 5 × LG 310 Wp modules (existing) and 4 × JA Solar 550 Wp modules (new) – 3.75 kWp in total
  • Solis 5 kW inverter
  • Victron 3 kW inverter/charger for backup supply
  • 2.5 kWh lithium battery

What we delivered

  • Load assessment and design to integrate the two module types safely, on separate strings matched to the inverter inputs
  • Roof-mounted array with corrosion-resistant mounting
  • DC and AC protection, surge protection, and earthing
  • Testing, commissioning and handover with monitoring setup

Services involved

Solar PV & BESS Testing & Commissioning

Solar PV & BESS

Installation type
Rooftop
Number of modules
54
Module make
LG, JA Solar
Module rating
310,550 Wp
Inverter make
Solis, Victron
Inverter capacity
53 kW
Battery chemistry
LFP (lithium iron phosphate)
Estimated annual generation
5.1 MWh/yr
Grid connection scheme
Net metering
Monitoring system
Yes

Testing & Commissioning

Equipment tested
Switchgear / panels, Cables, PV systems, Batteries / UPS
Voltage levels
LV (400/230 V)
Tests performed
IEC 62446-1 tests: visual inspection, string Voc and polarity (LG and JA strings), insulation resistance, earth continuity, Solis grid and anti-islanding checks, Victron and battery functional tests, and backup changeover test.
Utility handover (EDL/LECO)
Yes